Project Objective

The primary objective of this project is to establish a specialized infrastructure for Tehran Fire Department to facilitate technical and vehicle maintenance services. This workshop is designed to support firefighting equipment and vehicles, providing necessary facilities for repair, maintenance, and optimization of firefighting vehicles and related equipment

Project Description (Under Implementation)

1- Excavation and Site Preparation:
The project commenced with earthworks and site preparation for the structure’s foundation. This process included land leveling, soil compaction, and establishing proper groundwork conditions for construction.

2- Structural Framework:
The main structure of the workshop was designed and constructed using a robust, modern steel frame. The steel skeleton was engineered to withstand both operational loads and Tehran’s environmental conditions, ensuring resistance to seismic activity and weather variations.

3- Mechanical & Electrical Installations: (In Progress)
The project will implement comprehensive MEP systems, including:

– HVAC systems  to maintain optimal working conditions

– Heating/cooling equipment  for year-round operational efficiency

– Advanced electrical systems  for power supply and industrial-grade lighting

4- Civil Works: (In Progress)
Interior construction will include:

– Partition wall installation

– Doors/windows fitting

– Specialized floor coatings and ceiling finishes

Gallery

Location

Tehran

Project Specifications

1,785 m² (3-Story Structure)

b

Project Client

Tehran Fire and Safety Services Organization (Municipality of Tehran)

Supervising Authority

Technical and Development Deputy

Project Duration & Timeline

12 Months

Project Start Date

November 2024

Project Completion Date

Under Implementation