
Project Objective
This project was designed with the goal of providing a safe, durable, and high-quality structure for modern living. By utilizing innovative materials and technologies, the company aims to adhere to international standards and create a sustainable structure for long-term use
Project Description
1. Procurement and Supply of Steel Structure: Procuring and supplying the steel structure with the required specifications and high quality, along with expert consultation in selecting the most suitable options for the 48-unit buildings.
2. Installation of Steel Structure: Precise execution of the steel structure installation process in compliance with construction and engineering standards. Installation phases include planning, site preparation, implementation of connections and welding, quality control, and completion of installation.
Gallery
Location
Tehran
Project Specifications
17,000 m² (9-Story Twin-Block Complex)
Project Client
Technical Engineering Management of the IRGC Personnel Services Center
Supervising Authority
Client Supervision
Project Duration & Timeline
150 days
Project Start Date
June 2021
Project Completion Date
June 2022