Project Objective
This project is designed with the aim of completing the medical infrastructure of Kerman city and increasing the capacity to provide medical and healthcare services in this region. The main objectives include improving the hospital’s physical space, developing medical facilities and modern medical equipment to enhance the quality of services for patients and ensure a favorable and safe treatment experience
Project Description
1- Procurement of Materials: At this stage, high-quality and durable materials were selected in accordance with hospital standards. The use of suitable materials for walls and disinfectable floorings ensured compliance with hygiene principles. Additionally, the design of various hospital departments was carried out in line with therapeutic architectural standards.
2- Completion of Architectural Operations: This operation included the construction and finishing of walls, installation of durable and non-slip floorings, creation of appropriate ceilings, and execution of specialized sections such as operating rooms, laboratories, inpatient wards, and intensive care units. The spaces were designed considering ergonomic principles and the comfort of patients and medical staff.
3- Implementation of Mechanical Installations: Installation of advanced mechanical systems including air conditioning, central heating and cooling, water supply systems, and disposal of medical wastewater constituted other important aspects of the project. These installations were designed using modern technologies and in accordance with energy optimization principles.
4- Implementation of Electrical Installations: The hospital’s electrical installations included internal and external lighting systems, emergency power, and electricity supply for advanced medical equipment. This section was designed and executed with the goal of reducing energy consumption and ensuring safety.
Gallery
Location
Kerman
Project Specifications
3,000 square meters (4 floors)
Project Client
Ground Forces of the Islamic Republic of Iran Army
Supervising Authority
Engineering and Installations Organization of the Islamic Republic of Iran Army Ground Forces
Project Duration & Timeline
12 months
Project Start Date
march 2021
Project Completion Date
march 2022