Project Objective

This project has been designed and implemented with the aim of establishing sustainable and secure infrastructure for the protection and management of water resources in Lake No. 5. The significance of this peripheral dike lies in creating a balance between the preservation of natural resources and regional sustainable development. The primary objectives have been to control water flow, reduce flood risks, and maintain the ecological integrity surrounding the lake

Project Description

1- Material Procurement: In this phase, the project team selected and procured high-quality, durable materials. The materials used were specifically suited for the construction of hydraulic structures, capable of withstanding water pressure and environmental changes.

2- Peripheral Dike Construction: The execution of this 700-meter operation required precise excavation and proper compaction. The dike wall was then constructed using advanced technologies and in accordance with hydraulic engineering principles. The dike was designed to resist the pressures caused by intense water flows.

 

Gallery

Location

Markazi Province – Zarandieh

Project Specifications

700 meter

b

Project Client

Tandis Tejarat Bakhtar Company

Supervising Authority

Technical Department of Tandis Tejarat Bakhtar Company

Project Duration & Timeline

12 months

Project Start Date

September 2021

Project Completion Date

September 2023