Project Objective

This project was designed with the goal of providing a safe, durable, and high-quality structure for modern living. By utilizing innovative materials and technologies, the company aims to adhere to international standards and create a sustainable structure for long-term use

Project Description

1. Procurement and Supply of Steel Structure: Procuring and supplying the steel structure with the required specifications and high quality, along with expert consultation in selecting the most suitable options for the 48-unit buildings.

2. Installation of Steel Structure: Precise execution of the steel structure installation process in compliance with construction and engineering standards. Installation phases include planning, site preparation, implementation of connections and welding, quality control, and completion of installation.

Gallery

Location

Tehran

Project Specifications

17,000 m² (9-Story Twin-Block Complex)

b

Project Client

Technical Engineering Management of the IRGC Personnel Services Center

Supervising Authority

Client Supervision

Project Duration & Timeline

150 days

Project Start Date

June 2021

Project Completion Date

June 2022